收藏本页 您好,欢迎来到上海澳门威尼人7983,将竭诚为您服务!    工作时间:上午 9:00 - xia午 18:00 wenxin提示:
EHS wang站
热门搜索:
防火柜、anquan柜、hua学pin柜、工yeanquan锁具、盛漏托盘、吸fumian套装等工yeanquan与环bao产pin;实验台、实验室jia具、通feng柜、实验柜等实验室设计规划、生产、an装ji配件;离心ji、防爆工具、烘箱、超声波清洗ji、shuizhijian测仪器ji实验室耗材等共3大类产pin。
产pin分类
pinpaizhuan区 >>geng多
防yi漏托盘UltraTech,Spill Prevention, Control and Countermeasure Act |上海澳门威尼人7983实验室设备有限公si
防yi漏托盘

Spill Prevention, Control and Countermeasure Act

Intent
Driven by the EPA's Federal Water Pollution Control Act (as amended by the Clean Water Act), this ruling is designed to prevent discharges of oil and oil-related materials from reaching navigable waters and adjoining shorelines.
 

Background of the SPCC Act
The SPCC rule took effect on January 10, 1974. It was revised and strengthened in July of 2002. Parts of the original rule were unclear (i.e. container size was not specified) and compliance was expensive for small business due to the need to obtain certification by a Professional Engineer (PE).
 

Regulated Materials
Animal oils, fats and greases (including oils from fish or marine mammals), asphalt, aviation gasoline, bunker fuel, crude oil, cutting oil/machine coolants, dielectric fluid, diesel fuel, heating oil, gasoline, greases, hydraulic oil, jet fuel, lubricating oil, mineral spirits, motor oil, naptha, natural gas condensate, oil refuse, oily wastes (other than oil mixed with dredged soil), stoddard solvent, synthetic oils, tall oil, turpentine, residual fuels, used oil, vegetable oils (including oils from nuts, seeds, fruits and kernels). These materials are hereafter referred to as “oil” in this document.
 

Who must comply?
Facilities with total, above-ground, oil storage capacity (not actual gallons on site) of greater than 1,320 gallons. Storage containers that are 55-gallons and greater are used to calculate total capacity. Facilities with below-ground storage capacity of greater than 42,000 gallons must also comply. Facilities that meet such criteria must develop and implement a written SPCC Plan. Certain facility types, i.e., convenience stores, are exempt. In addition, EPA has extended compliance dates for four (4) problem areas: a) qualified, oil-filled operational equipment, b) motive power containers, c) mobile refuelers, and d) animal fats & vegetable oils at onshore & offshore oil production, drilling facilities.
 

What are the basics of an SPCC Plan?
The SPCC Plan must address all relevant spill prevention, control and countermeasures necessary to minimize the potential for oil discharge. One requirement is to provide appropriate containment and/or diversionary structures, i.e. dikes, berms or retaining walls, to prevent a discharge. A means of secondary containment sufficient to contain the capacity of the largest single compartment or container is mandated. Products that seal drains or divert spills from drains, as well as sorbents, are considered "control" or "countermeasures".
 

When is compliance required?
Compliance dates for facilities (other than farms) are as follows:
 

Copyright? 2003-2020  上海澳门威尼人7983实验室设备有限公si版权所有
电话:021-69106488 021-69106624 传zhen:021-69106489 地址:上海市松江区guang富林路658long3号xiezi楼1410室 邮编:201620

沪ICP备13012389号    

沪公wangan备 31011402005026号